THE BUILDING
The building will comprise ground and four upper floors with undercroft parking below. It will have pedestrian access to a main reception from Langley Walk, a tree lined walkway which runs between the existing Midland Heart office building and the new Langley Point ‘sister’ building. A second reception lobby will be created at lower ground floor giving direct access from the secure car park.
The grade A internal specification will include the following:
- Designed to BREEAM excellent standard;
- Fully raised access floors;
- Suspended ceilings incorporating
LG3 and LG7 lighting; - Chilled beam air conditioning system;
- High efficiency gas fired low pressure trench heating system;
- High quality reception and common area finishes;
- Solar panel water heating;
- 90 secure car parking spaces;
- Energy efficient building.
CLICK PICTURE TO ENLARGE
